Direct for Owner –Relocation of Southeastern PA offices -Completed October 2016



Atlantic Coast Communications NJ, Inc. has been Shire’s communication vendor since 2005. We have provided numerous design and build installations for the Chesterbrook, PA offices. The most recent project relocated the operation to Exton, PA. Work at this site included new optical and copper backbone to 4 IDF locations .

Installation of 1100 Category 6 cables and reuse of 500 existing cables.  We are in process of adding over 1000 sound masking units throughout this new office site for Shire. 

ACC provided all break down and reinstallation of over 550 desktop devices allowing all parties to arrive at the new office site ready to work on day 1. 

21 Sep, 2022
Vineland, NJ – 24/7-365 Pharmaceutical glass manufacturing facility –ACC installed redundant aerial, underground and inside plant optical backbones connecting 9 buildings at this South Jersey location. ACC performed this work direct for Corning as part of our Shared Services Agreement.– Completed Summer 2016
21 Sep, 2022
Art Education Institute houses largest collection of impressionist and post impressionist art in the world –Philadelphia Completed May 2012  ACC installed infrastructure for the world renowned Barnes Foundation new home designed by Tod Williams Billie Tsien Architects as contracted by LF Driscoll. The work included build out of an MDF and 4 IDF locations and Category 6 station wire throughout serving the galleries, administrative and classroom sections, wireless and wired networks and an extensive IPTV security system.
21 Sep, 2022
New Construction 48 Story commercial and residential Tower Philadelphia Completion December 2016  FMC Tower is a 49 Story Commercial and Residential office tower in Philadelphia PA. ACC performed this work as part of our contract with Turner Construction. Levels Sub Basement through 26 are for commercial Tenants. Levels 28 and up are an AKA property and feature short and long term furnished and unfurnished living space. ACC installed backbone to accommodate all data and limited analog voice connectivity to 46 IDF locations throughout the site. Additionally we installed all core and shell communications connectivity and interior apartment station wiring for all voice, CATV and data requirements. The building’s façade lighting is Ethernet controlled and is an iconic skyline spectacle. Additionally, ACC installed a Public Radio Repeater system to support public safety radio transmission throughout the site. Work was completed on schedule and to the satisfaction of the GC and owner.
21 Sep, 2022
Philadelphia - Labs and Classrooms Completed January 2015  Atlantic Coast Communications performed installation of backbone distribution (Data, Voice and CATV) to 8 IDF locations and category 6 station wiring serving over 2500 station users in this new laboratory at Temple University. Work for the project was performed for the Gordon Group who handled the electrical construction and fit-out. ACC has been a vendor of choice at Temple since 2000. We have been involved with minor and major retrofits and construction projects for the University and Health system including Morgan Hall Dormitory and Dining facility. We continue to support University IT infrastructure needs on a daily basis as demand requires.
21 Sep, 2022
Corporate Headquarters Relocation – King of Prussia, PA Completed October 2016  Atlantic Coast Communications NJ, Inc provided a Category 6A cable solution to this technology and healthcare personnel provider for the corporate relocation to King of Prussia. Work consisted of copper and fiber backbone to three IDF locations and installation of over 1000 Category 6A cables. This work was performed direct for The Judge Group.
21 Sep, 2022
Direct for Owner –Relocation of Southeastern PA offices -Completed October 2016  Atlantic Coast Communications NJ, Inc. has been Shire’s communication vendor since 2005. We have provided numerous design and build installations for the Chesterbrook, PA offices. The most recent project relocated the operation to Exton, PA. Work at this site included new optical and copper backbone to 4 IDF locations . Installation of 1100 Category 6 cables and reuse of 500 existing cables. We are in process of adding over 1000 sound masking units throughout this new office site for Shire. ACC provided all break down and reinstallation of over 550 desktop devices allowing all parties to arrive at the new office site ready to work on day 1.
21 Sep, 2022
New Construction Philadelphia – Completed October 2016 –Dalian - Rodin Place is a residential apartment building with ground level retail recently completed in the Art Museum District in Philadelphia. The site has 293 apartments with amenities. ACC completed the installation of all voice, data and CATV within each apartment, feed cable to accommodate all back of house communications and all back of house base building wire for CATV, Voice and data connectivity. ACC was contracted to perform this work by the General Contractor, Intech.
21 Sep, 2022
Panasonic Everest Network Installation at Lincoln Financial Field, Home of the Philadelphia Eagles